New Projects

The floating car park is designed for calm waters and provides a practical solution to the problem of the chronic shortage of parking areas in large cities.
Entrance and exit points to the facility can be either on the sides or on the bow/stern of the car park.
The connection between the decks is by means of spiral ramps and passenger elevators.
Automated entry and exit systemsregister the flow of cars and take into account the free parking spaces.
The compartments in the hull can be used in different ways – for service stations for changing tires, charging batteries, car washes, for storage spaces, etc.
Several variants of the project have been developed.

Main dimensions4 decks5 decks6decks(1) 6 decks 6 decks 2 places
Total length85.00 m85.00 m85.00 m85.00 m85.00 m
Width13.00 m13.00m13.00 m13.00 m27.00 m
Draft1.45 m1.55 m1.70 m1.70 m~2.00 m
Total height15.20 m17.60 m20.00 m20.00 m~20.00 m
Height over waterline13.75 m16.05 m18.30 m18.30m~18.00 m
Height of each deck2.40 m2.40 m2.40 m2.40 m2.40 m

Notes:
1 – variant with shopping center
2 – variant with double hull

The facility is designed to provide emergency assistance in the event of natural disasters or industrial accidents and can be quickly towed to the affected area. The floating hospital can also be used to provide basic medical care in coastal or island areas. The facility’s four decks house all the necessary installations and equipment.
According to the basic designthe facility includes a reinforced concrete hull and four-deck steel superstructure. The hull is divided into watertight compartments, where are located: the rooms of the hospital staff; the engine room, diesel generators and other ship systems; laundry room, elevator rooms and other additional installations. The superstructure houses the all-inclusive hospital blocknecessary specialized medical departments, laboratories, hospital, etc.
The facility can work autonomously in emergency situations and during its dragging from one place to another – it has the necessary systems for the production of electricity, purification plants for drinking water, waste water storage, etc. When on site, the hospital is connected tocoastal infrastructure.

This facility is designed to provide luxurious conditions for up to 120 people. The main project includes, apart from the hotel part, a restaurant and a cafe with a capacity of 70 people. One of the advantages of a floating hotel is that it can be towed from one place to another, thus providing free capacity wherever and whenever it is needed.

The floating house is designed as a two-deck superstructure on a reinforced concrete hull. The main design includes 4 bedrooms, 2 living rooms, together with the corresponding sanitary facilities, and also a small pool in the bow of the hull.

The floating dormitory is intended for operation in rivers or calm waters. The facility can function autonomously in emergency situations and during its towing from one place to another – it has the necessary systems for the production of electricity, purification plants for drinking water, waste water storage, etc. When in place of operation, the dormitory is connected tothe shore infrastructure.
The reinforced concrete hull is divided into watertight compartments that house the diesel generators, sewage treatment facilities, pumps and other ship systems; laundry storage and auxiliary premises. According to the basic project, the superstructure is on two decks in a total built-up area of ​​1755 sq.m. Depending on the specific requirements and also taking into accountthe specific conditions of the place of operation, the number of decks can be increased, thereby increasing the capacity of the dormitory.

The floating reinforced concrete pool was designed for Egypt’s Four Seasons Resort. Its shape resembles the bow of a ship. The facility is anchored to the seabed, and the connection to the shore is made by a hydraulic leveling sluice leading to a fixed pontoon.
The 22.50*13.50m swimming pool occupies the front central part of the hull. The depth varies from 1.40m to2.20 m.
The walls and bottom of the pool are permeable, which ensures natural circulation of the mork water. Steel netting has been installed to protect visitors.
The superstructure of the facility is on two decks, on which there are grill and cocktail bars, umbrellas and cabanas.